Photovoltaic-Storage Integration Project in Topband Huizhou Industrial Park

2026-03-23

a5241c799fa96eab1407bae990558bcd.avif

Distributed Photovoltaic: 941 kWp, annual electricity generation can reach over 1 million kWh;
DC Charging Pile: 40 kW low-power DC pile one unit, 240 kW integrated dual-gun DC pile one unit;
AC Charging Pile: 7 kW AC pile 10 units;
Energy Storage System: 100 kW/215 kWh integrated energy storage cabinet 2 units.

Project Location: Huizhou Industrial Park