Photovoltaic-Energy Storage-Charging Integration Project in Chongqing Xiaomian Industrial Park

2026-03-23

图片6.png

 

Distributed Photovoltaic: 1.24MWp, with an estimated annual power generation of over 1 million kWh.
Energy Storage System: 0.625MW/1.3MWh.
AC Charging Piles: 7kW AC charging piles, 20 units.
Project Location: Chongqing Xiaomian

     Industrial Park.