Photovoltaic Charging Integration Demonstration Project in Yuanshan Service Area

2026-03-23

dde3024dc02260576de086a7ab417e61.avif

Project Overview: A photovoltaic charging integration demonstration project for the high-speed service area, which is one of the first batch of projects in Guangdong Province.
Photovoltaic Capacity: 1MWp, with an annual power generation capacity of over 1 million kWh.
Energy Storage Capacity: 4 units of 100kW/215kWh integrated energy storage cabinets.
Charging Station: Equipped with 4 sets of 480kW charging piles, including 4 ultra-fast charging piles (600A) and 20 fast charging piles (250A), capable of simultaneously charging 24 new energy vehicles.
Project Location: Yuanshan Service Area on the Huizhou-Zhongshan Expressway (East/West Service Area)